Abstract

The lower reaches of Jinsha River host the richest hydropower energy sources in China. With the construction of Wudongde and Baihetan, the multi-objective optimization for cascade reservoirs (along with Xiluodu and Xiangjia Dam) in the lower reaches of Jinsha River will create significant benefits. This paper focuses on the competitive relationship between flood control and power generation, and attaches attention to the measurement of different objective functions and their competitive relationship. With observations of the flood in 1974, 1981, and 1985, a 100-year return period flood with peak-3d volume pair as different inputs for the optimal model is approached by NSGA-II. Different flood seasons divided by flood feature is applied to figure out specific competitive relationship. The results can be concluded as the following: (1) Strong competitive relationship mainly occurs in pre-flood season. (2) Whether it shows a strong competitive relationship depends on the amount of discharge. If the turbine is set to full capacity, power generation is fulfilled certainly, which means that there exists a weak competitive relationship between multi-objectives. (3) The different processes of floods have an effect on the duration of a competitive relationship. A flood with a late peak causes the extension of strong competition in the pre-flood season, which lends itself to a strong competition relationship in the post-flood season. (4) The intensity of competition in the pre-flood season is higher than that in the post-flood season because it has a larger range.

Highlights

  • Flood disaster is one of the most destructive natural disasters [1]

  • The results show that flood control and power generation present an interactional and mutually contradictory relationship

  • The results show that flood control and power generation present an interactional and mutually nodes nodes of of the the reservoir reservoir operation operation and and judges judges the the trend trend of of the the flood flood control control and and power power generation generation contradictory relationship

Read more

Summary

Introduction

Flood disaster is one of the most destructive natural disasters [1]. In order to mitigate flood disasters, people build water conservancy projects such as reservoirs to reduce flood risks. Reservoir operation is an important means of flood control and disaster reduction, which has been studied by many scholars in the past decades [2,3,4]. With the development of hydrological forecasting, meteorological forecasting, and computer technology, the ability of utilizing reservoir operations to reduce flood damage improves. Many investigators propose some other purposes like hydropower generation, water supply, ecology, and irrigation during flood season [5,6]. All of these objectives, along with flood control, constitute the multi-objective optimal operation of reservoir systems in the flood season. Taking the multi-objective optimal operation of flood period into account, we can make

Methods
Results
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.