Abstract

This paper presents the application of IEC 61850 protocol in electrical power engineering industry for data communication systems between substations. This IEC 61850 protocol presents new challenges for real-time communication performance between Intelligent Electronic Devices (IEDs) within substation because of the Generic Object Oriented Substation Event (GOOSE) messages. The analyses of substation Ethernet and WLAN (wireless LAN) communication delay, its impact factors, various methods and different network topologies which can improve the real-time performance are discussed. For basic analysis of data flow within a substation, the Optimized Network Engineering Tool (OPNET) software is used. The process-to-bay level network simulation model is performed by using the OPNET software. The Ethernet delay and WLAN peer-to-peer performance of the process-to-bay level network simulation results are analyzed which is based on AP (access point), switched, shared Ethernet network or peer-to-peer network.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.