Abstract
Contingency studies are indispensable tools of both the power system planning and operational studies. Real time implementation of operational problems makes necessary the use of high speed computational methods while requiring reasonable accuracies. On the other hand, accuracy of the results and the speed of calculation depend on branch outage modeling as well as solution algorithm used. This paper presents a comparison of post outage bus voltage magnitudes calculated by two meta-heuristic approaches; namely differential evolution (DE) and harmony search (HS) methods. The methods are tested on IEEE 14, IEEE 30, IEEE 57, and IEEE 118 bus test systems and the results are compared both in terms of accuracy and calculation speed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.