Abstract

To maintain the pressure of cargo tank and to minimize natural gas loss, two nitrogen expansion cycles for boil-off gas (BOG) re-liquefaction systems, specifically designed for small LNG ships are proposed and optimized: 1) Case 1, re-liquefaction process with the parallel nitrogen expansion, 2) Case 2, re-liquefaction process with the serial nitrogen expansion. The simulation and analysis of the two processes are carried out by using Aspen HYSYS and the genetic algorithms are selected as the optimization method. It can be found that the specific energy consumption (SEC) of 0.7333 kWh/kgLNG, the coefficient of performance (COP) of 0.2538 and the figure of merit (FOM) of 0.2827 are achieved in Case 1 and the SEC of 0.7539 kWh/kgLNG, the COP of 0.2464 and the FOM of 0.2757 are achieved in Case 2 by comparing the two optimized cases. Moreover, the total exergy losses for Case 1 and Case 2 are 153.34 kW and 160.69 kW, respectively.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.