Abstract

This paper compares the computational time and closed loop system performances for linear and nonlinear Model Predictive Control (MPC) of the full bridge DC/DC converter under starting, overload and load step change conditions. The control objective is to regulate the output voltage without violating the peak current constraint. The experimental results reveal that both linear and nonlinear MPC algorithms can successfully achieve voltage regulation and peak current protection. Considering the algorithm complexity, the closed loop performance and the necessary computational time, the nonlinear MPC scheme is more desirable than the linear MPC for this application.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.