Abstract
A communication method and system between the distribution network planning system and the grid geographic information system. After the change of the grid structure, the grid equipment change information is generated with the grid equipment as the unit. The production control region information structure is used to encapsulate the grid equipment change information, obtain the equipment change bus message, and send the equipment change bus message to the production control region service bus, This enables the distribution network planning system to receive equipment change bus messages from the production control area service bus, so that the distribution network planning system can directly communicate with the grid geographic information system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.