Abstract
Korean high heat flux test facility for the plasma facing components of nuclear fusion machines will be constructed to evaluate the performance of each component. This facility for plasma facing materials will be equipped with an electron beam gun with a 60 kV acceleration voltage. The system also includes a 300 kW power supply system, a vacuum test chamber, and a beryllium filtration system for the ITER first wall mockups. First, a commissioning test has been scheduled to establish the installation and preliminary performance experiments of the copper hypervapotron mockups and evaluate the thermo-hydraulic specifications. Second, a qualification test will be performed to evaluate the CuCrZr duct liner in the ITER neutral beam injection facility and the ITER first wall small-scale mockups of the semi-prototype, at up to 1.5 and 5 MW/m2 high heat flux, respectively. This electron beam system will be used to qualify the specifications of the plasma facing components in the KSTAR tokamak and other fusion devices.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.