Abstract

<p>This paper gives a detail introduction of collapse simulation of some critical construction stages of Taiping Lake Bridge, which is a CFST arch bridge with main span of 336m in Anhui Province, China. Arch ribs are erected by temporary cables-stayed system with cantilever construction method. During construction of this bridge, in every one of the 23 working stages the collapse simulation was carried out with FEM method. According to the results the structure system of Taiping Lake Bridge in construction is strong enough. Here gives examples on two key stages.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.