Abstract

In Experiment 1, matching of relative response rates to relative rates of reinforcement was obtained in concurrent variable-interval schedules when the absolute values of the two concurrent variable-interval schedules varied from 6 sec and 12 sec to 600 sec and 1200 sec. Increases in the duration of the changeover delay, however, produced decreases in the relative response rates and, consequently, some deviation from matching. In Experiment 2, matching of relative response rates to the relative duration of the reinforcer failed to occur when the equal variable-interval schedules arranging access to the two different reinforcer durations (1.5 and 6 sec) were varied in size from concurrent variable-interval 10-sec schedules to concurrent variable-interval 600-sec schedules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.