Abstract

Engineering firm Black & Veatch and consulting engineers Greeley and Hansen have been selected by The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) to develop a master plan to guide capital improvements for the 1200 million gallon per day (mgd) Stickney Water Reclamation Plant (WRP). This is a short news story only. Visit www.worldpumps.com for the latest pump industry news.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.