Abstract

The Just-In-Time (JIT) philosophy has received a great deal of attention. Several actions such as improving quality, reducing setup cost and shortening lead time have been recognized as effective ways to achieve the underlying goal of JIT. This paper considers the partial backorders, lot size reorder point inventory system with an imperfect production process. The objective is to simultaneously optimize the lot size, reorder point, process quality, setup cost and lead time, constrained on a service level. We assume the explicit distributional form of lead time demand is unknown but the mean and standard deviation are given. The minimax distribution free approach is utilized to solve the problem and a numerical example is provided to illustrate the results. .

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.