Abstract
ABSTRACT Environmental Impact Assessment (EIA) and Risk Assessment (RA) are critical tools for assessing and managing environmental impacts and risks of projects. However, their integration remains a challenge. This study examines how EIA practices account for risks in evaluating the environmental feasibility of mining dam projects in the state of Minas Gerais, Brazil. We analyzed licensing processes for projects approved between 2004 and 2022, using data from the state’s environmental agency. Methods included documentary and content analysis of Environmental Impact Statements (EIS) and review reports. Among the 25 cases analyzed, most focused solely on risk control without performing RA. Only two cases included RA, and two others lacked any risk-related information. Review reports revealed that only two went beyond considering risk control when assessing environmental feasibility. This suggests decision-making relies on a narrow focus on risk control. Furthermore, there is a misalignment between the EIS content and the criteria for project acceptability in review reports. Finally, we explore how politicization may undermine the EIA’s role in objective, and evidence-based decision-making. These findings underscore the superficial and fragmented approach to addressing environmental risk in mining dam assessments in Minas Gerais.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.