Abstract

There are plenty of pipes to be arranged in subway station platform. Optimizing the air-conditioning system ducts is especially important because of its large size. Due to the location of stairs and the size of ducts, the platform exhaust ducts of a Shanghai subway station were laid out within the range from the stair to the end of the platform which probably can’t exhaust smoke effectively in fire. In reconstruction plan, air supply ducts and discharge ducts are connected and valves are added. Air supply pipe can be changed into discharge duct by controlling the valves. The smoke extraction performances of the original plan and the reconstruction plan are analyzed with the CFD numerical simulation. The results show that the reconstruction plan can make up the shortcoming of the original plan and contribute to the layout of pipes in new platform.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.