Abstract
In the daily operation of many power plants, the urea consumption of denitration system is much more than normal. Therefore, the process of site testing and laboratory analysis are carried out. Several suggestions are given out. (1) The position of sampling hole on the exit flue of denitrification system should be redesigned. (2) The denitrification optimization and adjustment should be carried out based on the technical specifications for the operation system. (3) The flue gas CEMS system for single point sampling should be transformed into two or three point sampling mode. (4) When the coal - fired unit is shutting down, examine the ammonia injection and nozzle branch, in order to improve the operation reliability of denitration system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.