Abstract
AbstractTeaching construction project management is a challenging task. This difficulty comes from the fact that students typically lack background information (i.e., project experience) to fully understand how newly introduced materials/concepts relate to real project situations. In fact, the lack of background information to relate new concepts acts as both a motivational and cognitive deterrent. For example, if information cannot be related or linked to existing concepts, it will be located on the periphery of memory as an island independent of all other cognitive processes, and as such will have a very short shelf life. The objective of this paper is to present an educational method that can integrate the vast experience of construction industry professionals into effective teaching practices. Hence, this paper proposes an education approach that is based on (1) presenting a construction method as applied by practicing engineers (i.e., a case study); (2) developing a generalized principle of the conce...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Practice Periodical on Structural Design and Construction
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.