Abstract
A large lead-liquid scintillator electromagnetic calorimeter has been built for a “direct photon” experiment at CERN. Gain equalisation and monitoring of the calorimeter were achieved by two complementary computer-controlled calibration systems, a laser system connected by optical fibres and a system of moveable radioactive sources. Final corrections to the equalisation were made using the physics data recorded during the experiment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.