Abstract

Build sequence scheduling is an important topic in mixed-model production. It is to determine the order of products being built in the assembly line. Significant research has been conducted to determine good sequences based on various criteria. For example, in Just-In-Time production systems, optimal sequences are searched to minimize the variation in the rate at which different parts were consumed. This paper discusses the selection of optimal build sequences based on complexity introduced by product variety in mixed-model assembly line. The complexity was defined as the information entropy that operator processes during assembly, which indirectly measures the human performance in making choices, such as selecting parts, tools, fixtures, and assembly procedures in a multi-product, multi-stage, manual assembly environment. In an earlier paper by the authors, a simple version of complexity measure has been developed for i.i.d. (independent identically distributed) sequences. This paper extends the concept and takes into account the sequential dependence of the choices and its impact on build sequence schedules. A model based on Hidden Markov Chain is proposed to model the sequence scheduling problem with the constraints by spacing rules. Methodologies developed in this paper enhance the previous work on modeling complexity, and provide solution strategies for build sequence scheduling to minimize complexity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.