Abstract

Abstract Two years of BIOX pilot plant data have been examined for steady state conditions and then correlated using logistic kinetics. It was found that the logistic equation not only predicted the performance of individual stages but also the degree of biooxidation across the entire cascade of bioreactors. It was found that the rate constant was 1.3 day -1 in the first three stages and 0.3 day -1 in the fourth stage. The maximum removal constant was 0.90 in stage 1 and 0.99 in the remaining stages. Plant retention time ranged from 4 to 12 days with corresponding sulphide oxidation varying from 82 to 98% respectively, and primary stage removal rates varying from 8.9 to 4.4 kg m -3 day -l , respectively. In addition, batch biooxidation data were obtained. The biooxidation rate was found to be about half that for the continuous bioreactors. This is in agreement with the findings of several other workers. The specific rates of bioxidation of pyrite and arsenopyrite were very similar for the bulk concentrate at about 0.15 day -1 . However, it was significant that the biooxidation of arsenopyrite in the mixed mineral preceded that of pyrite, suggesting a sequential mechanism. Gold liberation was found to be linearly related to arsenopyrite biooxidation but oxidation of pyrite appears to be preferential in the gold-rich regions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.