Abstract

The benefits gained in design mediated by Building Information Modelling (BIM) technology are manifold, among them stand out the early visualization, the generation of accurate 2D drawings, collaboration, verification of design intent, the extraction of cost estimates and performance evaluations. By adopting this modeling technology and using to produce, communicate and analyze architectural or engineering solutions practice is transformed. Therefore, the implementation of this new method of working in architectural design and engineering firms finds resistance, implies in adoption stages where incremental adjustments must occur to overcome difficulties and ensure learning and gaining with the new process. The Architectural and Engineering Office COORDENADORIA DE PROJETOS (CPROJ ), belonging to the School of Civil and Architecture and Urban Planning of the University of Campinas, seeks continually innovations therefore incorporated BIM in its design method. This paper presents a practical case, that is, the first large scale project developed with BIM, considered to be a BIM pilot study at CPROJ. The pilot study was the research laboratory of the Center of Molecular and Cellular Engineering of the Boldrini Children’s Hospital. Training efforts and ownership of BIM previous to the pilot study and the pilot study itself are presented. The highlights and lessons learned in this process are summarized. The understanding of how BIM changed the office production and qualitatively benefits achieved are presented.

Highlights

  • The benefits gained in design mediated by Building Information Modelling (BIM) technology are manifold, among them stand out the early visualization, the generation of accurate 2D drawings, collaboration, verification of design intent, the extraction of cost estimates and performance evaluations

  • This paper presents a practical case, that is, the first large scale project developed with BIM, considered to be a BIM pilot study at COORDENADORIA DE PROJETOS (CPROJ)

  • Uso do NavisWork foi uma opção inclusive pelo programa possuir um visualizador disponível a todos os parceiros do projeto e possuir ferramentas que possibilitem comentários e organização dos comentários, conforme é possível ver na Figura 12

Read more

Summary

Introduction

The benefits gained in design mediated by Building Information Modelling (BIM) technology are manifold, among them stand out the early visualization, the generation of accurate 2D drawings, collaboration, verification of design intent, the extraction of cost estimates and performance evaluations. A implantação de uma nova metodologia de trabalho em um escritório de projetos de arquitetura e engenharia passa por diversos estágios e encontra resistências e adequações que devem ser superadas para garantir o aprendizado e o ganho com o novo processo.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.