Abstract
BIM-lean integration for construction scheduling of road intersections
Published Version
Join us for a 30 min session where you can share your feedback and ask us any queries you have
https://doi.org/10.1016/j.autcon.2025.106247
Journal: Automation in Construction | Publication Date: Aug 1, 2025 |
Citations: 1 |
BIM-lean integration for construction scheduling of road intersections
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.