Abstract

Tunnel risk assessment plays an important role in tunnel design, construction and tunnel safety risk control. TBM method is more and more widely used because of its comprehensive advantages, especially in the diversion tunnel engineering. Because the geological conditions in the long tunnel are complex and changeable, TBM machines are extremely sensitive to the changing of geological conditions, various risks may occur during the TBM tunnel construction. But the risks are difficult to assess quantitatively. In this paper, an excavation model of diversion tunnel is established in ANSYS to analyze the deformation of surrounding rock, the instability probability of tunnel is obtained by Monte-Carlo method. Combined with BIM technology, the construction information model of TBM tunnel including personnel distribution, team cooperation, material transportation, structure layout and other engineering information is established. Based on combining surrounding rock information and TBM engineering information, the TBM tunnel is divided into several sections according to time and space by statistical method, the collapse risk of TBM tunnel during construction is quantitatively assessed by zoning to realize the visualization of risk class. The results can be used for TBM tunnel construction risk assessment, improving the efficiency of risk control.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.