Abstract
The installation of special-shaped curved keel should not only be reliably connected with the main structure, but also meet the requirements of panel installation in the later stage of the curtain wall. Different professions have different construction precision, and there are inevitable errors in the construction process. Therefore, strict control of the first-pass rate of installation of special-shaped curved curtain keel is the key of curtain wall construction. In this paper, by making full use of BIM technology to optimize analysis and model program installation and construction, the first-pass rate of installation of special-shaped curved curtain wall keel is greatly increased from 76% to 92%. The successful application of this process provides reference for similar projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Academic Journal of Architecture and Geotechnical Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.