Abstract

In case of 765kV transmission line tripping, there is a Special Protection Sheme(SPS) in Korea power system. To avoid generator over-speed, preselected generators can be tripped by SPS. However, the system frequency can be under the Under Frequency Relay(UFR) 1st pickup level 59.92Hz when large scale generators are tripped. Accordingly, generation constraints can arise until new transmission lines are installed. In this paper, we proposed BESS for mitigating generation constraints of large scale generators, and we applied to the Korean power system in 2022 to analyze the effects of BESS application.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.