Abstract

To ensure the safety of bridge bearing replacement procedure, the project introduces the real-time monitoring technology. Collects displacement data, stress data, elevation and temperature are collected by displacement sensor, stress sensor and so on. Data processing and analyzing by the computer provides guidance for replacement procedure. The results of the monitoring and timely analysis of data collation provide guidance for the replacement process. Engineering practice results show that real-time monitoring technology is an important means to ensure the bearing replacement safe, but it should develop a reasonable scientific monitoring program.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.