Controversies over that the scheduling practices for the construction projects in Korea are unsystematic, illogical, and less advanced still continue. One of the main controversial issues is that the existing scheduling techniques does not satisfy the scheduling requirements of construction site. Because most construction personnel prefer a good-looking and easy understanding schedule, LOB and TACT techniques although those are not formal CPM technique have been applying overwhelmingly in the construction projects. Moreover, LOB and TACT techniques can be quickly and conveniently established by Excel or word-processor familiar with most people. Since Excel is not a formal scheduling software, however, it can not provide formal CPM scheduling practices. The purpose of this study is to propose the method that can satisfy visual schedule format as well as perform formal CPM scheduling practices by integration of LOB and TACT techniques by BDM technique.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.