Abstract

This paper discusses a feeding system of the sugar industry consisting of six subsystems—unloaders, cane carrier and cutter unit, crushing unit, boiler unit, bagasse carrier unit and turbines. Cane carrier and cutter unit, crushing unit, bagasse carrier unit and boiler unit are working in series. In sub-system ‘unloaders’ one unloader is operative and another is kept as cold standby whereas, in sub-system ‘turbines’ both the turbines work in parallel. The distribution of failure times of sub-systems of feeding system is taken as exponential while the distribution of repair times of sub-systems is considered as arbitrary. The feeding system is analyzed by using supplementary variable technique. A particular case is also considered to show the behavior of availability and profit of the feeding system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.