Abstract
Newly proposed power system control methodologies combine economic dispatch (ED) and automatic generation control (AGC) to achieve the steady-state cost-optimal solution under stochastic operation conditions. However, a real power system is subjected to continuous demand disturbance and system constraints due to the input saturation, communication delays and unmeasurable feed-forward load disturbances. Therefore, optimizing the dynamic response under practical conditions is equally important. This paper proposes a state constrained distributed model predictive control (SCDMPC) scheme for the optimal frequency regulation of an interconnected power system under actual operation conditions, which exist due to the governor saturation, generation rate constraints (GRCs), communication delays, and unmeasured feed-forward load disturbances. In addition, it proposes an algorithm to handle the solution infeasibility within the SCDMPC scheme, when the input and state constraints are conflicting. The proposed SCDMPC scheme is then tested with numerical studies on a three-area interconnected network. The results show that the proposed scheme gives better control and cost performance for both steady state and dynamic state in comparison to the traditional distributed model predictive control (MPC) schemes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.