Abstract

We consider (k, k) fork-join scheduling on a large number (say, N) of parallel servers with two sets of heterogeneous rates. An incoming task is split into k sub-tasks and dispatched to k servers according to a probabilistic selection policy, with parameter ps being the selection probability of slower servers. Mean task completion time admits an integral form, and thus it is analytically intractable to compute ps that minimizes it. In this work, we provide an upper bound on the mean task completion time, and determine ps that minimizes this upper bound. Numerically, this choice has been shown to be near-optimal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.