Abstract

According to the structural characteristics and the surrounding environment of partially cable-stayed bridge, an asymmetric construction method combinded with support cast-in-place and cantilever casting is applied for main girder construction, based on project of Yuyao cable-stayed bridge. Its basic idea is as follows: One deck section is concreted with brackets in advance, which to offer counterweight for basket construction symmetrically. The technical features and construction key point are described in detail, which provides reference for similar bridge construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.