Abstract
This study assessed the technological feasibility of converting open cycle to combined cycle gas power plants. The study was carried out on all the operational power plants in Nigeria, using both primary and secondary data sources. The data collected were analyzed using descriptive statistics. The results showed that out of the 72 open cycles and 5 combined cycle units considered, 60.0, 0, 33.3 and 6.7 % of the power plants had turbines that were installed between 1-5 years, 6-10 years, 11-15 years and 16 years and above, respectively. Similarly, 66.6 and 13.3 % of the plants had General Electric and Siemens machines installed in their plants. The power plants ran efficiently with a heat rate and thermal efficiency range between 9.33 to 14.44MJ/KWh, 25 to 39 % for open cycle plants and 6.63 to 11.97MJ/KWh, 30 to 54 % for combine plants. The result also showed that by using the average generation of each plant in the last 3 years as a baseline for conversion, an additional 1142.1MW would be obtained after conversion to the combined cycle without an increase in gas consumption. The study concluded that conversion of the gas turbine from open cycle to combined plants is technologically viable and an additional generation of 1142.1MW can be obtained.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: UNIOSUN Journal of Engineering and Environmental Sciences
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.