Abstract

By using Genetic Algorithms (GAs), a resource-integrated model is presented to identify the relationships between project time and cost in consideration of the changes in resource efficiency under different working durations. Under the assumption of a non-linear quadratic relationship between resource efficiency and working duration, the minimum and maximum project costs for different project completion times are easily identified and the trade-off relationships between the project time and cost are clearly presented by using the proposed model and a case study. The research results logically suggest that the greater the adjustable range of activity durations, the lower the minimum project cost for a specific project’s completion time will be, and the greater the value of an activity is, the later the activity will be adjusted.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.