Abstract

Beginning with the disassembly of the semi-finished modules, the general assembly process of satellites is quite different from that of other mechanical products. This kind of disassembly-reassembly process cannot be solved by the widely used cut-set theory that only deals with linear problems, thus an approach called Dynamic Transition Graph (DTG) is proposed to solve this nonlinear assembly sequence planning problem. By analyzing and verifying possible assembly statuses hierarchically through matrix operations, a DTG is produced on the basis of Liaison Graph, where the DTG includes all the geometric feasible assembly sequences for the general assembly of satellite. Finally, the effectiveness of this method is verified by an example.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.