Abstract

The goal of production scheduling is to achieve a profitable balance among on-time delivery, short customer lead time, and maximum utilization of resources. However, current practices in precast production scheduling are fairly basic, depending heavily on experience, thereby resulting in inefficient resource utilization and late delivery. Certain computational techniques have been proven effective in scheduling. To enhance precast production scheduling, this research develops a Multi-Objective Precast Production Scheduling Model (MOPPSM). In the model, production resources and buffer size between stations are considered. A multi-objective genetic algorithm is then developed to search for optimum solutions with minimum makespan and tardiness penalties. The performance of the proposed model is validated by using five case studies. The experimental results show that the MOPPSM can successfully search for optimum precast production schedules. Furthermore, considering buffer sizes between stations is crucial for acquiring reasonable and feasible precast production schedules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.