Abstract

A feasibility study, design, and cost estimate have been completed for a 1 MWe photovoltaic (PV) facility which would float on an inland reservoir at Catalina Island. If built, this would be one of the largest PV operating facilities to date and also the first floating PV system. The modular installation consists of 250 floating platforms, each supporting 430 ft 2 of flat panel PV cells. Three tracking systems were considered; a two-axis tracking, a one-axis tracking, and a non-tracking system. The non-tracking and one-axis tracking systems were carried through the final design stage. The one-axis system was most cost effective. The total cost of the one-axis tracking system is about $4.0 million; the cost of the non-tracking system is about $3.7 million. The levelized energy costs for the two systems are about $0.37/kWh and $0.42/kWh respectively. This facility would provide 25% of Catalina's yearly peak energy demand; reducing the amount of diesel fuel used for power production. The aquatic environment provided difficult and unusual design criteria.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.