Abstract

In the nuclear power plant (NPP) safety, the safety analysis of the NPP is very important work. In Fukushima NPP event, due to the earthquake, the cooling system of the spent fuel pool failed and the safety issue of the spent fuel pool generated. After Fukushima NPP event, INER (Institute of Nuclear Energy Research, Atomic Energy Council, R.O.C.) performed the safety analysis of the spent fuel pool for Chinshan NPP which also assumed the cooling system of the spent fuel pool failed. The geometry of the Chinshan NPP spent fuel pool is 12.17 m × 7.87 m × 11.61 m and the initial condition is 60 ¢J / 1.013 × 105 Pa. In general, the NPP safety analysis is performed by the thermal hydraulic codes. The advanced thermal hydraulic code named TRACE for the NPP safety analysis is developing by U.S. NRC. Therefore, the safety analysis of the spent fuel pool for Chinshan NPP is performed by TRACE. Besides, this safety analysis is also performed by CFD. The analysis result of TRACE and CFD are similar. The results show that the uncovered of the fuels occur in 2.7 days and the metal-water reaction of the fuels occur in 3.5 days after the cooling system failed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.