Abstract

The works associated with the construction of infrastructure facilities in the field require significant involvement of highly qualified specialists, high-quality implementation of these works and it requires adjustment of the developed project documentation directly in the construction process. PJSC «Gazprom neft» is faced with the task of increasing the efficiency of capital projects, in particular, reducing the time for their implementation. The faster the field is equipped and ready to start production, the sooner the capital investment in the project will pay off. The article discusses the method of organizing the construction (arrangement) using block-complete devices, namely one of its methods – superblocks. The essence of the method is the manufacture in the factory of modules, enlarged mounting assemblies, instrumentation and automation devices and their subsequent enlarged assembly into a large-capacity unit (superblock). The mass of the superblock can reach up to 1000 tons. The use of superblocks in the development of oil and gas fields guarantees high productivity, time saving and the quality of the facilities being built.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.