Abstract

Aiming at deficiency of cost higher in large area, and deep foundation pit excavation with conventional Top-Down method, A new Top-Down excavation method was introduced based on the general top-down excavation method. The key design techniques of the new Top-Down method include: using the temporary fender cast-in-place piles as exterior-protected construction in top-down excavation process; substituting level bracing system by basement slabs; combining the vertical structural supporting column with the temporary vertical shoring etc. A series of new techniques, including the profiled bar — concrete controlled bracing system, substituting level bracing system by variable level basement roof slap, several large diameter rings bracing on complex boundary condition, the top-down method of podium and the down-up method of turret etc. were first introduced and practiced in excavation engineering. It is shown that the new top-down method have good economic and social benefits. The method provides a new excavation engineering design choice for the similar pits, and the technology will be modified and improved in the future excavation design applications.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.