Abstract

Facing the energy crisis and environmental problems, saving energy of construction machinery, especially in the hydraulic excavator is very important. Regeneration of the potential energy is an effective solution to save energy. However, the conventional hybrid excavator can’t regenerate the potential energy. This paper proposes a new structure of boom system of hydraulic excavator as well as a control strategy. The focus of the paper is using hydraulic transformer to regenerate energy and reusing the regenerated energy. The simulation is carried out by the AMESim software. From the simulation results, this new system has a high efficiency for energy saving.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.