Abstract

In this paper the hydro-thermal scheduling problem is discussed. An interconnected hydro-thermal electric power system is scheduled such that maximum economy is achieved. The schedules obtained are designed to meet a specified active power demand and simultaneously to satisfy energy constraints imposed on the hydro-plants generations. The scheduling problem is solved by the use of functional analysis and, in this case, the minimum norm problem formulation is employed. It is emphasized that the optimal solution found here is guaranteed to be the unique optimal solution. The practical implementation of finding the generation schedule is illustrated by way of two examples.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.