Abstract

The critical chain project management theory(CCPM) combining the critical chain technology and resource-constrained project scheduling problem (RCPSP) is an important innovation of project control methods, and it’s widely used to optimize the project duration recently. In this paper the theory presented is applied to the maintenance period arrangements of power plant electrical equipment, and a mathematical model of optimizing the maintenance period is established. Then an improved heuristic algorithm is designed and used to establish equipment maintenance precedence network. On this basis, a new identification method of maintenance network based on critical chain is proposed. Finally, it’s verified with a numerical example that the method proposed can effectively shorten the maintenance period of power plant electrical equipment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.