Abstract
This study presents an analysis of the effect of the transport delay which occurs in solar flat-plate collector fields and how to include its behavior in dynamic models suitable for control purposes. This investigation has been carried out using simplified models based on dynamic energy balances and models based on step response methods and experimental tests. The solar flat-plate collector field encompasses parallel absorber pipes intertwined with pipelines which act as several first-order plus dead time systems in parallel. The effect is an apparent delay observed at the outlet temperature that must be included in the dynamic model in order to reduce the error between the real measurement and the model prediction. The main contribution of this paper is the procedure to evaluate the apparent delay to obtain adequate dynamic models aimed to be used for control purposes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.