Abstract

SummaryThe amount of axial settlement of casings supported by regions of axial elastic foundations is computed. The differential equation of axial equilibrium, including the foundation stiffnesses, is solved by use of cubic axial finite elements. The analysis is applied to 101 m of a vertical 914-mm (36-in.) casing supporting a 559-mm (22-in.) casing running from 3 m above the mudline to near the bottom of the 1201-m hole. The upper casing is supported by a region of layered clay sediments. The lower casing has a long openhole region, followed by a bottom region encased in cement. A series of loading increments is applied, with the connection of the tree/blowout preventer (BOP) as the last. The settlement at the mudline was calculated to be less than 0.1 m. This study shows that for weak upper foundations, a good cement job is needed to support the tree/BOP without large mudline settlements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.