Abstract

Based on the elastic theory and the seepage flow theory, a new analytical solution with consideration of the seepage force is proposed to determine the external stress on the lining of a circular TBM tunnel. According to this solution, the relationships between the permeability coefficient of rock masses and the maximum allowable drainage flow are studied. The influence of the controlled drainage flow and the elastic modulus of surrounding rocks on the external stress is discussed. Moreover, in order to validate the results obtained from the elastic analytical solution developed in this paper, a comparison between the results obtained from the solution considering the seepage force and that without consideration of the seepage force is performed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.