Abstract
According to actual engineering of a highway neighborhood tunnel, The surrounding rock stress field monitoring of bench cut method has done and the field monitoring data has been compared with numerical simulation results. The result shows: The surrounding rock stress release with time in excavation, every construction step can effect the stress of surrounding rock and lining. The construction of excavation and the secondary can disturb the surrounding rock stress near another tunnel in neighborhood tunnel. After the completion of secondary lining, the stress of primary lining have decreased and secondary lining receives apart of surrounding pressure.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.