Abstract

Combining with the construction of Dazhangcun Grand Bridge of Datong-Xian passenger dedicated railway line, typical pile foundations’ axial load of steel bars and settlement of foundation was monitored and analyzed. At the same time, some meaningful conclusion which were reference and guiding significance for design and construction of the similar project in collapsed loess district were drawn.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.