Abstract

Combined with the construction of Jinghang Canal Bridge of Jiangliu highway, shrinkage and creep property of the cast-in-situ high performance concrete of bridge girder was researched. The results showed early shrinkage and creep development of the high performance concrete was relatively rapid, and creep tended to be stable 120 days later. With the admixture increasing, shrinkage and creep of the concrete were reduced. Meanwhile, early creep rate deceased. Similar results applied to the reduction of sand rate and water-cement ratio. Based on creep prediction models both at home and abroad, hyperbolic power function and exponential function model were put forward, taking the influence of material parameter and environmental factors on shrinkage and creep into consideration. In accordance with the model, concrete creep formula was given out and would provide a relatively scientific basis for practical prediction of concrete creep.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.