Abstract

The rapid growth of power grid load put forward higher requirements on the transmission capacity of line, with the growing tension of line corridors, building new transmission lines is becoming more and more difficult. Therefore, it is of realistic significance to analyze the transmission capacity of existing transmission line and fully tap the existing power grid transmission capacity. On the basis of previous studies, and consulting a large number of references, this paper summarizes and expounds the methods of improving transmission capacity by using the thermal rating analysis, introducing static thermal rating and real-time static thermal rating. Also, this paper verifies applications of the above methods in actual running environment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.