Abstract

In view of certain areas of Guizhou are soft sandstone rock, where single block of rock's hardness is very low and easily crushed, complicated hydrogeology and low level of complex surrounding rock and geological conditions, geological radar prediction is used before the excavation of the tunnel, and New Austrian Tunneling Method was used in the construction. The process of construction segment had been monitored and measured, and the deformation of tunnel had been controlled. According to the situation during excavation and monitoring, the construction method was further improved. Through tracing and monitoring the tunnel construction of from zk40+430 to zk40+630 sections for two months, showed that the tunnel construction method is effective in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.