Abstract

The cut-off wall of Xiabandi project commenced in April 2006, cutoff wall and curtain grouting project were completed in November 2009, monitoring equipments for dam foundation seepage and cutoff wall were installed in June 2009. Through the analyzing of the observational data from 2006 to 2010 and the statistical date of cut-off wall section deflection, the stress and strain values and water level changes during water storage, the characteristics of cut-off wall deformation under construction and in the storage are fully and accurately reflected, while the feedback to guide the construction with the monitoring information has also played an active role.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.