Abstract
The 4th Nanjing Yangtze River Bridge North Terminal Chuhe Bridge is a prestressed concrete composite box-girder bridge with corrugated steel webs constructed by cast-in-place cantilever method. In order to shorten the construction period, it takes the closure scheme which is under asymmetric constraint. In this paper the force and stress in each important construction stage under different closure schemes were analyzed. The results showed that the procedure of the closure method under asymmetric constraint is feasible.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.